Contract Summary

  • Published Date: 2 July 2021

  • Tender Status: active

  • Tender Opening Date: 2 July 2021

  • Tender Closing Date: 2 August 2021

  • Award Date: n/a

  • Contract Start Date: n/a

  • Contract End Date: n/a

  • Contract is suitable for SMEs: Yes

  • Contract is suitable for VCSEs: No

  • Official Journal of the European Union (OJEU) Contract Type: Works

Print

Description

The purpose of this pre-qualification is to provide you with detail about the project, so that you can advise us which aspects of the project you wish to bid for; and if any of these are of interest, to seek responses to the pre-qualification questionnaire. From these responses we will be selecting a shortlist of Contractors to issue an Invitation to Tender.

The project will install 2 district heat networks at Kingston Maurward College, Dorchester, which will use ground source heat pumps to replace the existing oil and LPG boilers as the source of heating and hot water.

The College has obtained a Government Public Sector Decarbonisation Scheme grant which requires that the project must be completed by 31st March 2022.

Interested parties are requested to respond to [email protected] by Friday 9th July 2021, indicating whether you will be submitting a full PQQ response.

If you wish to submit the full response, please email the completed Appendix A (expression of interest) and Appendix B (PQQ) of the attached pre-qualification document to [email protected] by Monday 2nd August 2021.

Project Overview

The project is split into 2 districts and a ground array as follows:

1. Main District:

High temperature GSHPs with a total capacity of approximately 400kW will be required. These are to be located in a new prefabricated plant room, which will be sited on a slope and require a raised foundation slab. A new heat main (approx. length 500m) will connect the system to 13 existing heating systems (via heat exchangers) serving 19 buildings. The new district heating system will also provide heat to a Visitors Centre, which is currently heated with electric heaters.

As well as the plant room foundation, builders work will be required to clear structures and create an access road to the plant room.

Electrical power to the new plant room will be provided under a separate contract.

All existing oil / LPG plant will need to be removed from the plant rooms.

2. Glasshouses District:

High temperature GSHPs with an approximate capacity of 224kW are to be located in an existing plant room. A new heat main (approx. length 100m) will connect the system to provide heat to 5 glasshouses already supplied from the plant room, plus the nearby Gardener's Cottage, currently heated by a wood burner.

Builders work may be required to create plinths for the new plant; plus a foundation slab for the thermal store, which will be located outside the plant room.

Existing oil plant will need to be removed from the plant room serving the glasshouses.

3. Ground Array:

Both districts will be supplied from a single large ground array of approximately 120,000m2, to be installed in nearby fields within the College grounds. The flow and return pipes will require a road crossing.Timetable

The following is an outline of the intended timetable. These are latest dates and will be accelerated if possible:

About the Buyer

Contact name: Nigel Aylwin-Foster

Address: 20 Headley Road,Grayshott
HINDHEAD
GU266LB
England

Telephone: 01428 608462

Fax: n/a

Email: [email protected]

Value of Contract

Price Range: £200,000 - £2,000,000